Falco Construction operates an Environmental Management System (EMS) which is certificated against International Standard ISO 14001. The system provides us with the framework to ensure we comply with all relevant environmental legislation and minimises the impact our works have on the local environment as well as their consequences for Global Climate Change.

For each project or contract we carry out an Environmental Impact Assessment which identifies the key issues to be managed: Typically these include:

Pollution

We use the very latest plant and equipment which minimise the emissions of noise and vibration. Noisy works are routinely undertaken ‘out of hours’ and within noise barriers; noise, vibration and air quality monitoring at the perimeter of site provide evidence of compliance with Section 61 notices and planning constraints; we apply robust systems for capturing waste water and preventing contamination during underground works.

Waste

We have experience of preparing and maintaining site waste management plans (SWMPs) which detail the quantities and destinations of all excavation and other wastes we produce. Where possible wastes will be segregated on-site and removed to local partners for recycling.

Carbon management

We implement a number of measures to reduce our energy consumption and therefore the carbon footprint of our activities i.e. using local resources and fuel management systems are installed in our fleet of vehicles. Our registration with the ‘Sustainability School’ enables us to use their self assessment tool gather and processes data on energy consumption and equivalent carbon emissions.

Ecology

We have experience of implementing measures to preserve the biodiversity of areas in which we work which comply with environmental directives.

Local Community

We acknowledge our responsibilities to minimise disturbance and disruption to the local area and community. During the pre-construction phase we will consult with all relevant authorities to obtain the required permitting. A traffic management plan will typically be prepared and submitted for approval to the Local Authority for works that may affect public highways.

All of these impacts and activities are documented and can be submitted to environmental consultants to contribute to compliance with the civil engineering sustainability standard CEEQUAL.

Client Testimonial

Would you like to know more?

Get in touch with us today to find out how we can help with your project.